Planning, disconnection and reconnection for office moves — computers, servers, cabling, broadband and Wi-Fi, sequenced so you lose as little working time as possible
Last updated: August 2026
Removal firms move furniture. Almost none of them will unplug a server, label a patch panel, or ring your broadband provider — and that is precisely where office moves come unstuck. In our experience the computers are rarely the problem: they travel fine and plug back in. What goes wrong is connectivity. A line ordered three weeks before the move that turns out to need an eight-week installation, a new floor with no data points, or a Wi-Fi setup nobody thought about until forty people arrived and tried to use it at once. We survey both premises, work out the order things have to happen in, get the long-lead items started early, then disconnect, reconnect and test so your first morning in the new office is an ordinary working day.
We have run our Putney workshop for over 25 years and the business is fully insured — worth knowing when someone is coming into your home or office. Security and network work is led by a CISSP-certified consultant.
Same-day turnaround is available on many jobs — ask when you book and we will confirm availability and any additional cost before we start.
We walk both premises — the one you are leaving and the one you are taking on — and produce a written plan: what moves, what gets replaced, what has to be ordered now, and the order everything happens in. This is the part that decides whether the move is calm or chaotic.
Computers, monitors, docks, servers and NAS boxes shut down properly, labelled so they go back where they belong, and reconnected and tested at the other end. Your removals company handles the furniture; we handle everything with a cable coming out of it.
The kit that everything else depends on gets treated accordingly: a verified backup before it is touched, a controlled shutdown, careful transport, and a checked start-up at the new site. If shared files or line-of-business systems live on it, we test access before we call it done.
Data points where the desks are actually going, Cat5e or Cat6 runs terminated into a patch panel, a switch that can take the load, and tidy cable management in the comms cupboard. Far easier to do before the furniture arrives than after.
The single most common cause of a bad first morning. We check what is available at the new address, get the line ordered early enough for the provider's real timescales, plan the overlap with your old connection, and configure the router, firewall and access points before anyone sits down.
Printers and scanners reconnected and re-shared, phones and tablets pointed at the new Wi-Fi, docks and displays tested at each desk, and a walk round on the first morning to catch the handful of things that always turn up once people actually start working.
Simple steps to get your problem solved quickly and professionally.
We visit both sites, count desks and devices, look at where the incoming line lands and where the comms cupboard is, and check what cabling already exists. You get a written scope and a quote from that, not from a phone call.
Broadband, any new cabling, and hardware that needs replacing get started immediately, because these are the items with real lead times. Everything else is scheduled backwards from the date your connection will genuinely be live.
Old site shut down and disconnected in a set order; kit labelled and transported; new site cabled, connected and configured. Where it is possible we build and test the new network before the old one comes down.
We are there when your team arrives to sort the inevitable last few things — a desk that will not print, a phone that will not join the Wi-Fi, someone whose dock came back in the wrong box.
Prefer the quick version? The sections above cover most needs. Expand any topic below for more detail.
If an office move goes badly, this is usually why. Almost everything else can be rushed at the last minute; the connection cannot:
We have seen far more moves derailed by an install date than by anything to do with the computers.
The aim is that the new office is already working before the old one stops. Where the timing allows, we build in this order:
Build the new site first
Cabling, switch, router, firewall and access points installed and tested at the new premises while you are still trading normally at the old one. Nothing here needs your business to stop.
Prove the connection
The new line is tested for real — not just showing a light — before anyone commits to a move date. If it is not ready, we would rather know a fortnight early than on the Saturday.
Move the shared kit
Server, NAS and anything else the whole team depends on goes across in one controlled step, with a verified backup taken first and access tested at the far end before we move on.
Move the desks
Individual computers, monitors and docks are labelled per person so they come back together, which removes most of the first-morning confusion in one stroke.
Test desk by desk
Every position checked for network, printing and sign-in before your team arrives, rather than leaving people to discover the gaps themselves.
How much of that is possible depends on your dates and the landlord's access arrangements, which is exactly what the survey establishes.
A short list, and having it ready makes the quote quicker and more accurate:
If you do not have all of it, do not wait — the survey will fill the gaps, and starting the broadband conversation early matters more than having a complete list.
Not sure what you need? We're happy to help.
We quote per site after a survey rather than publishing a headline figure, because a six-desk move and a forty-desk move over two floors have almost nothing in common. The survey covers both premises and produces a written scope, so you can see exactly what is included and what is not before you commit. Cabling, hardware and any broadband or line charges are itemised separately rather than buried in a single number.
Surveyed First · Written Scope · Itemised Quote
Lenovo ThinkPad wouldn't POST after a failed BIOS update. At our Putney SW15 workshop we reprogrammed the SPI flash chip with verified Lenovo firmware.
A Balham SW12 home office had a new Dell WD25 dock that charged the laptop but wouldn't drive either new monitor. We fixed the configuration on site in one visit.
What IT support really costs in the UK in 2026 — market rates per user, hourly and ad-hoc pricing, what drives the price, and our own published figures.
What Bambu Lab HMS error codes mean and how to fix the common ones — AMS feed, Z-homing, nozzle clog and heatbed errors — plus how to look up any code.
We provide Office IT Relocation in London across South West London
Serving Wandsworth, Wimbledon, Putney, Clapham, Balham, Tooting, and surrounding areas.
View all service areasTell us the new address and your target date and we will tell you honestly whether it is achievable, what needs ordering first, and what a survey would involve. Call 020 7610 0500 — the earlier the conversation, the smoother the move.